Grid congestion: what does it mean for the IT in your building?

The Dutch power grid is full in many places. That also affects IT in commercial buildings: server rooms, cooling, charging points and extensions. What can you do?

The power grid in the Netherlands is full in many places. This is called grid congestion. You mainly hear about it for factories, solar parks and data centres. But it also affects ordinary commercial buildings. And with that, the IT in those buildings.

How big is the problem?

In mid-2026, the regional grid operators had 15,498 requests on the waiting list for taking power from the grid, together almost 10,000 megawatts. Companies that want a new or heavier connection then have to wait, sometimes for years.

Two changes in 2026 matter for commercial buildings:

  • Small connections too. Since 1 July 2026, small users with a connection of up to 3x80 amps can also end up on the waiting list when there is no room. Many smaller offices and business units fall into this group.
  • One waiting list. Since 1 July 2026 there has been one waiting list for large and small users, with rules on who gets priority.

In some regions it is extra tight. Around Eindhoven and Utrecht, all new requests have had to wait since 1 July. In the provinces of Noord-Brabant and Noord-Holland the government uses a special regional approach.

What does this have to do with IT?

IT uses electricity, and it is using more:

  • Server rooms and cooling. A server room of your own with cooling can be a large part of an office's electricity use.
  • Backup power. A UPS for the network uses power itself, and has to be charged.
  • Power over the network cable. Access points, cameras and sensors more and more often get their power through the cable (PoE). More devices means more power in the patch cabinet.
  • Charging points. These are often on the same network and the same connection.
  • AI. Most AI computing happens in data centres. The International Energy Agency expects data centre electricity use worldwide to more than double, from 415 terawatt hours in 2024 to about 945 terawatt hours in 2030, with AI as the main driver.

So if you want to extend a building, make it more sustainable with a heat pump, add charging points and use more IT at the same time, you will reach the limit of the connection sooner.

Cross-section of a commercial building with six numbered assessment points: incoming fibre, technical room, cabling per floor, WiFi per room, building systems and mobile coverage on the roof.
From the meter cupboard to the roof: these are the six points we assess in a building.

What does it mean for the value of your building?

In June 2026, the Dutch real estate association NVM Business said that commercial buildings with enough power capacity are rising in value. Buildings without room on the grid are harder to let or sell. For buyers and tenants, the question "what can the connection handle?" is becoming as important as the question about the internet connection.

What can you do?

  1. Know what your connection can handle. Check what capacity you have contracted, and how much you use at busy moments. An energy management system shows this per quarter of an hour.
  2. Make the IT more efficient. Take a critical look at a server room of your own. Is it still needed, or can it move to a professional data centre or the cloud? Replace old equipment, set the cooling correctly and switch off devices that do nothing.
  3. Include PoE in your sums. For new access points, cameras and sensors: add up the power, and choose a switch and UPS that can handle it.
  4. Plan extensions early. Want more charging points, a heat pump or a larger server room? Request the capacity from the grid operator well in advance.
  5. Look at flexible agreements. With a capacity steering contract (capaciteitssturingscontract) you agree with the grid operator to use less power at busy moments, or more when there is room. From 1 January 2027, Dutch grid operators must also offer a group transport agreement, which lets companies share capacity in an energy hub.
  6. Consider a battery. It can absorb peaks, and can also serve as backup power.

Include it in purchases and renovations

Buying a building? Then include the power connection and room on the grid in your research, next to the digital infrastructure. Read Technical due diligence in real estate: do not forget IT. Planning a renovation? Then plan the IT and the power together. Read Refurbishing your office? Include the IT infrastructure straight away.

What does this mean for the IT-Label?

During an IT-Label audit we look at the technical room, the cooling and the backup power of the network. Want to know how your building is doing? Take the free self-scan or request a pre-inspection. For a purchase, a digital due diligence helps.